File
Unit rate contracts: is it a model for oil sands projects?
Digital Document
Abstract |
Abstract
This project will investigate strategies that help provide cost surety to the oil sands construction industries. The project will begin with a review of the historical cost overruns and the lessons learned. The next focus point will be reviewing the demographics of Wood Buffalo to demonstrate the changes that have occurred since the early 2000s and refute the labour availability claim. Following the demographic review we will review construction contracts and the use of good faith as a contractual term. We will then conclude with a review of a unit rate simulation and discussion. --Leaves 2-3. |
---|---|
Persons |
Persons
Author (aut): Hibbitts, Patrick Anthony
Thesis advisor (ths): Cox, Raymond A. K.
|
Degree Name |
Degree Name
|
Department |
Department
|
DOI |
DOI
https://doi.org/10.24124/2014/bpgub1650
|
Collection(s) |
Collection(s)
|
Origin Information |
|
||||||
---|---|---|---|---|---|---|---|
Organizations |
Degree granting institution (dgg): University of Northern British Columbia
|
||||||
Degree Level |
Subject Topic | |
---|---|
Library of Congress Classification |
Library of Congress Classification
TN873.C2 H53 2014
|
Extent |
Extent
Number of pages in document: 55
|
---|---|
Physical Form |
Physical Form
|
Content type |
Content type
|
Resource Type |
Resource Type
|
Genre |
Genre
|
Language |
Language
|
Handle |
Handle
Handle placeholder
|
---|
Use and Reproduction |
Use and Reproduction
Copyright retained by the author.
|
---|---|
Rights Statement |
Rights Statement
|
Language |
English
|
---|---|
Name |
Unit rate contracts: is it a model for oil sands projects?
|
Authored on |
|
MIME type |
application/pdf
|
File size |
17103094
|
Media Use |