File
A capital budgeting analysis of the proposed Site C Dam
Digital Document
Abstract |
Abstract
This paper looks at the issues surrounding BC Hydro's the capital budgeting decision for the proposed Site C Dam on the Peace River in northeast British Columbia, Canada. The project is compared with a potential combined cycle natural gas-fired thermal electricity generating facility. Techniques such as net present value, internal rate of return, modified internal rate of return, profitability index, payback period, modified payback period, and equivalent annual annuity are used to evaluate six scenarios. These scenarios have varying values for weighted average costs of capital and carbon tax rates. A sensitivity analysis addressing changes to weighted average cost of capital inflation rate, electricity price, annual electricity output, capital cost, carbon tax rate, and the price of natural gas identifies the largest uncertainties faced by the project and compares them with the natural gas alternative. --Leaf ii. |
---|---|
Persons |
Persons
Author (aut): Mikkelson, Tyler
Thesis advisor (ths): Cox, Raymond A. K.
|
Degree Name |
Degree Name
|
Department |
Department
|
DOI |
DOI
https://doi.org/10.24124/2014/bpgub1647
|
Collection(s) |
Collection(s)
|
Origin Information |
|
||||||
---|---|---|---|---|---|---|---|
Organizations |
Degree granting institution (dgg): University of Northern British Columbia
|
||||||
Degree Level |
Subject Topic | |
---|---|
Library of Congress Classification |
Library of Congress Classification
TC558.C32 S5855 2014
|
Extent |
Extent
Number of pages in document: 67
|
---|---|
Physical Form |
Physical Form
|
Content type |
Content type
|
Resource Type |
Resource Type
|
Genre |
Genre
|
Language |
Language
|
Handle |
Handle
Handle placeholder
|
---|
Use and Reproduction |
Use and Reproduction
Copyright retained by the author.
|
---|---|
Rights Statement |
Rights Statement
|
unbc_15475.pdf17.78 MB
21140-Extracted Text.txt112.99 KB
Download
Language |
English
|
---|---|
Name |
A capital budgeting analysis of the proposed Site C Dam
|
Authored on |
|
MIME type |
application/pdf
|
File size |
18643061
|
Media Use |