shutdown system to be fitted to all towers, because at present a derailment could destroy several towers before the underspeed relay initiated a shutdown. Maintenance As may be expected from reading this paper, main- tenance requirements are extremely heavy. A crew of 11 men, with a foreman and general foreman, look after the mechanical maintenance requirements of the EXISTING PROFILE AND NEW PROFILE Upper Section of Tramline crusher and tramline. The tramline works on a five- day, three-shift basis, with two days normally sched- uled for maintenance. In addition to these two days, additional time is scheduled as required for major work. During the time the tramline is operational, the track ropes are lubricated by a special oiler car which is permanently fastened in the string of tramcars. The car wheel operates a pump to apply lubricant to the FIGURE 9 — Existing profile and new profile for the upper section of the tramline. Floating hopper-type bin. Counter weight take-up 60" Reversible belt _10' diameter tail wheel with / Polyurethane tread _- Deflection sheave ..—— Track rope anchors Car cleaner FIGURE 10 —Tramline discharge terminal. — 8 =