eliminated fugitive dust at the tailings conveyor discharge point. Concurrent with this was the elimination of "swivel pilers" and thete eootecenent with a radial stacking conveyor: An observable reduction of airborne particulate occurred as a result of these changes. Tailings conveyors are being progressively. replaced. Newly designed and installed conveyors with completely enclosed galleries have reduced conveyor speeds, reduced trans- fer points, and enlarged belt widths, all of which have contributed to environmental improvement. Between 1973 and 1976, diversion work was carried out to relocate Troutline Creek to a point further south of the Plantsite. ‘This eliminated possible water contamination from the stockpile. A restraining berm was installed to impound runoff during spring- time. A paving program was initiated in 1976 to reduce fugitive road dust in the Plantsite area.