ae a i i \ a \ | | ae ” | ‘ cc PHILLIPS BARRATT Roe ESTIMATE OF COST 1. Fill Added dredging Added fill placing in dry oe CASE NO. 2 - THREE FEET OF SETTLEMENT 16,800 cy @ $2.50 $ 42,000. 11,000 cy @~ 1.25 14,100. Added Total $756,100. Total Case No. ] 1,603,200. Total Case No. 2 $ 1,709,300. Contingency and Engineering 161,700. ESTIMATED TOTAL COST $ 1,871,000.