Page 1. EMISSION QUESTIONNAIRE ESTIMATE METHODS O ‘ El - Projected 1974 Annual Production based on. data from 1974 Fibre Production Schedule, Revision No. 8, «. September 5, 1974. , SCHEDULE TO ANTICIPATED GROUP CASSIAR GRADE December 31 SHORTFALL TOTAL 3 AAA 580 580 AA 1260 1260 A 5980 267 STA3 AC 7050 7050 14603 4 AK 29760 1100 28660 AS 10580 10580 392h0 5 AX 29280 1039 : 282h) AY 12525 356 12169 ohio 6 AZ 7685 208 TATT TAIT 104700 2970 101730 101730 E2 - Total of ore and waste actually removed to August 31, 1974, plus scheduled ore and waste removal for last quarter to December 1974. E3 - Total of waste removal (actual) to August 31, 1974 and waste removal O (scheduled) from September 1, 1974 to December 31, 1974. EL - Difference between E2 and E3, i.e. ore delivery to primary crusher. After crusher, ore grade is concentracted and approximately 20 to 25% low grade re- jected. E5 - No reliable data is available to allow reasonable estimate. It may be noted however, that drills are equipped with Rotoclones (inertial collection) and during 1976. Shall all be equipped with fabric filters. Most of the year, mining conditions are such that dust losses prior to crushing and drying are minimal. E6 - Estimated as 0.05% waste tonnage. ET - Estimated as 0.5% of net tons milled for period. E8 - Estimated as 0.5% of tons dried (691,480). Cyclone collectors used for ex- haust gas cleaning. E9 - Up to July 1973, dryer exhaust cleaned by cyclones. After July 1973, fabric filtration through NOMEX cloth used. Therefore, estimate is based on 0.25% of tons dried in 1973 (861,551). _ E10 - Dryers equipped with NOMEX filters rated at over 99.95% collection efficiency. Therefore, drying dust loss estimated at maximum of 0.005% of tons dried since ¥ it is unlikely that even one tenth of dryer feed would pass into exhaust prior ©. to filtration. Projected tons dried is based on 630,387 (January 1 to August 31, 1974), plus 78% of 392,000 (scheduled ore delivery to crusher September 1 to December 31, 1974.) 22% rejection rate is assumed after crusher. Pro- jected 1974 tons dried is thus 936,147. EEE LEM