(B) MN-16 MN-17 MN-18 MN-19 MN-20 MILLSITE (1). - ML-OL ML-02 ML-03 “ML-O} ML-O5 ML-06 ML-07 ML-08 (2) ML-09 #3, 1900 electric shovel | ‘i : #5, 1900 electric shovel Wabco ore removal : front end loader, ore, removal Euclid R-85, waste removal : ° TRAMLINE UNLOADING AND 1975 CONCENTRATOR top floor of tramline discharge building pottom floor of tramline discharge building, along ‘eonveyor 5771 gallery to discharge top floor (5th), 1975 mill concentrator th floor level, 1975 mill concentrator 3rd floor level, 1975 mill concentrator 2nd floor level, 1975 mill concentrator - lst floor level, 1975 miil concentrator along conveyor 5772 to intermediate transfer tower and 5772 discharge area : DRYER CIRCUIT: from concentrator (1975) discharge along conveyor #201 to dillon screens, about: dillon screens 1 and 2 about #80 hall screen, along #9 and 10 conveyors, about jaw crusher, along #4 and 5 conveyors over 2/3 dryers, baghouse walkways, beneath dryers, along 8/8A conveyors, discharge and transfer points about #1 dryer, wheelabrator baghouse, #18 and #226 conveyors i inside dryer operator's control room inside cab of operating loader in dry rock storage. | beneath dry rock storage along #1 conveyor up to mill entrance ; 2