Rid gue The collected sample is then transported to the laboratory for analysis. Particulate analysis required is normally gravimetric. In the case of asbestos, fibre analysis may be required. Most gaseous pollutant samples would be analysed using colorimetric and spectophotometric techniques. For cases where continuous monitoring is required, a field located analyzer, possibly infra red, is necessary. Costs for emission analysis vary depending on the method, but as a rough guide the following may be used. a) CONSULTANTS: $200/sample Air fare, on site transportation, access to sites, etc., plus $100 per technician per day are extra. To do the Powerhouse stacks for example would require about 4 to 5 days and cost about $5000. b) CASSIAR ENVIRONMENTAL: $30/sample & Equipment and Labour Equipment: Sampling train $5000 Reagents $ 200 Filters $ 100 Micro Balance $1500 Spectophotometer $1000 Miscellaneous $1000 $8800 In a month perhaps 50 samples could be collected and analyzed; considering wages and other costs including equipment, approximately 50 samples would be the break even point of cost/ sample equivalency to basic con- sultant costs. Any further sampling would only cost about 10% of consultants equivalent.