— ML-31 (4) ML-32 ML-33 ML-344 ML-35 ML-36 ML-37 ML-38 ML-39 ML-O ML-41 ML-h2 fiber storage MILL (1970 ADDITION): 7th floor, north section about fans, cyclones, .B.E.s, fiberizer and distributors | ve Tth floor, south of #14A conveyor, along #14B, 14C conveyors, #150 B/D B.E. 6th floor, north half, about P2, #202, 20, 30, 31, 32, 33; 301 airlocks, #2 A/B/D/E, #1 A/B/C/D/E/F, #6 A/B/C/D/E/ H.S., . #2A, #6D, #7D, #OA, #eD B.E. 6th floor, south half, about Pl, #150, 150B B.E., #205 airlock, #32 S.C., #83 0.F., #14A conveyor, over and about fibre Sins 5th floor, north half, about #3 A/B C/D/E/F, #21 A/3/C, #32C, #33 C/D H.S., #7D fiberizer, #65 A/B/C O.F., =6 A/E, #7, #2 A/D B.E., #11 A/B, #1 A/B/C/D, #9 A/B/C tees 5th floor, south half, about #84 A/B/C O.F., #150 BD 3.=., along: P conversion to 5X fan, around and between ficre bins cyclones A to F, #101 A/B O.F.., #14A D.D. 4th floor, north half about #7 D/E, #30D, #23C H.s #66 A/B, #74B O.F., #10 A/B/C D.D., #ehc, MH A,Ds conveyors, #13 A/B/C D.D., #4 B/E fiberizers, #26 #2 A/D, #6 A/D, #7D B.E.s hth floor, south half, P3 to 4X fan, #44 A/B/C D.D., #102 .A/B O.F., C-sonic, #150 S.C.s 3rd floor, north section from colum 21, #4 A/B/C/D, #20 A/B/C, #10 A/B, #12 A/B H.S., #23 S.c., #2A/2D, #20 B.E., Hl AY BCD Dea fesC Os. is) lea ~~ hay i) 3rd floor, central area, about #6D, 7D, 6A B.E., 727 A/B/C tec, #31D jumbo, #31 B.E., #34C tec, #33B B.S., #30G slice conveyor, #8D, 8E H.S. 3rd floor, south section from column 18, about #20F slide conveyor, #101 B.S., C-sonic discharge, #44 A/B B.S., inside pressure packer room, about #150 A/C B.E. 2nd floor, northwest section about #1 A/B crushers, #20A conveyor, 5's H.S., #24 conveyor, #2 A/D B.E. 2nd floor, northeast and south, about #15 A/B/C D.D., #24uC tec, #31D H.S., #34B, #25B B.S., #24 A/B conveyors, #26 A/B/C D.D., #25 conveyor tail section