| | a i : , PHILLIPS BARRATT Fie 4 ae ce \ i RIVTOW STRAITS LIMITED PROJECT NO. 75021-1 PORTLAND CANAL MARINE DEVELOPMENT ESTIMATE OF COST CASE NO. 1 - TWO FEET OF SETTLEMENT 1, Dredging, Fill and Rip Rap Heavy rip rap 16,100 cy @ $7.00 5 rele; 700- Light rip rap 4,700 cy@ 5.50 25,7006 Filter material 12,300 cy@ 3.60 44,300. Silt removal (dredging) 22,000 cy@ 2.50 55,000. * Dredging for fill material 362,000 cy@ 2.50 905,000. ** Additional Cost for placing fill by mobile equipment 236,300 cy@ 1.25 295,400. Sub-Total $ 15438, 300: 2. Trestle Piles 3,100 LF @ $9.00 $ 27,900. Timber 16 M @ $ 1,000.00 16,000. Sub-Total $ 43,900. 3. Dolphins 4 @ $ 12,500. $ 50,000. 4, Ramp Timber decking 8.0 MBFM @ $900. $ 74200 « Steel ramp 72,000 Ibs. @ 1.20 87,000. Steel float 17,000 Ibs. @ 1.20 20,300. Winch, etc. 6,500. Sub-Total $224 2000. Contingencies and Engineering ESTIMATED TOTAL COST * 19% of 362,000 cy = 69,000 cy is unusable silt. 362,000 cy ~- 69,000 cy = 293,000 cy of dredged material used for fill. Total silt dumped at sea = 22,000 + 69,000 = 91,000 cy. Rk $653,200. 160,800. $ 1,814,000. If pumping is permitted by the Fisheries Department, this cost would be deleted.